Kenson River Restoration Pre-application Consultation

Overview

Natural Resources Wales is working with Fonmon Castle to restore a section of the Kenson River in the valley of the Fonmon Estate near Rhoose in the Vale of Glamorgan.

Here are the draft planning application documents that we propose to submit to Vale of Glamorgan Council for approval.

  1. Application form
  2. Design and Access Statement
  3. Location Plan
  4. Flood Consequence Assessment
  5. General arrangement plan - reach 1
  6. General arrangement plan - reach 2
  7. General arrangement plan - reach 3
  8. General arrangement plan - reach 4
  9. General arrangement plan - reach 5
  10. General arrangement plan - reach 6
  11. Typical sections and details sheet - 1 of 3
  12. Typical sections and details sheet - 2 of 3
  13. Typical sections and details sheet - 3 of 3
  14. Preliminary Ecological Appraisal
  15. Preliminary Roost Assessment
  16. National Vegetation Classification Survey
  17. Water Vole and Otter Survey
  18. Geo-environmental Desk Study
  19. Water Framework Directive Scoping Assessment
  20. Water Framework Directive Screening Assessment
  21. Written Scheme of Investigation for a Cultural Heritage Desk-Based Assessment
  22. Cultural Heritage Desk-Based Assessment
  23. Generic Quantitative Risk Assessment - Ground Investigation and Contaminated Land
  24. Site Materials Management Plan
  25. Arboricultural Impact Assessment
  26. Green Infrastructure Statement

Please read and provide your feedback using the online survey link below or by emailing us directly at kensonriverrestoration@naturalresources.wales

Paper copies of the documents are available Llancarfan Village Hall.

We held a public drop-in session at Llancarfan Village Hall on 2 March 2026 for people to view the draft plans, speak with project officers, and ask questions about the proposed works.

Why your views matter

This consultation gives you the opportunity to help shape the proposal for the restoration of the Kenson River. By sharing your feedback, you can influence how the project is designed and delivered. Your responses will be considered before a formal planning application is submitted.

Closed 29 Apr 2026

Opened 19 Feb 2026

Areas

  • Rhoose

Audiences

  • River restoration

Interests

  • River restoration