Kenson River Restoration Pre-application Consultation

Overview

Natural Resources Wales is working with Fonmon Castle to restore a section of the Kenson River in the valley of the Fonmon Estate near Rhoose in the Vale of Glamorgan.

Here are the draft planning application documents that we propose to submit to Vale of Glamorgan Council for approval.

  1. Design and Access Statement
  2. Location Plan
  3. Flood Consequence Assessment
  4. General arrangement plan - reach 1
  5. General arrangement plan - reach 2
  6. General arrangement plan - reach 3
  7. General arrangement plan - reach 4
  8. General arrangement plan - reach 5
  9. General arrangement plan - reach 6
  10. Typical sections and details sheet - 1 of 3
  11. Typical sections and details sheet - 2 of 3
  12. Typical sections and details sheet - 3 of 3
  13. Preliminary Ecological Appraisal
  14. National Vegetation Classification Survey
  15. Water Vole and Otter Survey
  16. Geo-environmental Desk Study
  17. Water Framework Directive Scoping Assessment
  18. Water Framework Directive Screening Assessment
  19. Written Scheme of Investigation for a Cultural Heritage Desk-Based Assessment
  20. Cultural Heritage Desk-Based Assessment
  21. Generic Quantitative Risk Assessment - Ground Investigation and Contaminated Land
  22. Site Materials Management Plan
  23. Arboricultural Impact Assessment

Please read and provide your feedback using the online survey link below or by emailing us directly at kensonriverrestoration@naturalresources.wales

Paper copies of the documents are available Llancarfan Village Hall.

There will also be a public drop-in session at Llancarfan Village Hall (CF62 3AD) on Monday 2 March 2026 between 1:00pm – 6:00pm, for people to view the draft plans, speak with project officers, and ask questions about the proposed works.

Why your views matter

This consultation gives you the opportunity to help shape the proposal for the restoration of the Kenson River. By sharing your feedback, you can influence how the project is designed and delivered. Your responses will be considered before a formal planning application is submitted.

Share your views

Closes 19 Mar 2026

Opened 19 Feb 2026

Areas

  • Rhoose

Audiences

  • River restoration

Interests

  • River restoration